Wow. Long time, no action. I've been a busy girl lately what with work, work and evermore work.
But I also have been busier than I thought on the home front. I just stumbled upon my old "To-Do" List and was surprised by how much I've been able to check off without even paying attention:
COOP:
1.
Plumber to fix kitchen sink and bathtub CHANGE to Bathfitter October 13th2.
Electrician to fix outlet in living room-
Move kitchen cabinets to Left Side CHANGE to add base and upper cabinet in left corner October 13th b/t 3:30-6 and flip refrigerator -
Remove tile from bathroom walls CHANGE to Bathfitter October 14th 3.
Plasterer (Mom) to fix walls in all rooms (unpainted walls & ceilings)4.
Sheet vinyl for bathroom and kitchen floor CHANGE to mend tile in bathroom (OCTOBER 9th, ebay) and kitchen (need propane or dry ice) CHANGE to mend hole in floor and put down a thin vinyl or laminate floor that won't go too far above the surface
5.
Countertop for kitchen - 6 foot and 8 foot -Strip window and door in bathroom-cut counter for sink and for stove island & install
6. Paint trim (satin) and hall
(s) (linen) and Kitchen (Linen)
-
Faux glaze paint over patches-Paint Bathroom window
and touch up radiator with rustoleum satin white7.
Replace toilet to 12 inch. model8. Spray range, hood and fridge
9. Install hardware in kitchen
CONDO:
-
rearrange bedroom furniture for better flow -change kitchen faucet
-
fix front strip to countertop-
change toilet seat1.
get a/c duct in bedroom fixed (sort-of)2. install ceiling fan in bedroom
-
paint bathroom - rearrange living room for better flow-paint living room
-
get laundry sorting station for hallway-replace windows/screens/patio door
LAKEHOUSE:
-
replace toilet seats -
fix kitchen faucets, upstairs cold handle CHANGE to hire plumber to fix upstairs bath drain/wall, install shut-off valves in shower, replace shower faucet/head and fix shower drain. Also look into leaks in basement. -strip wallpaper (started)
-
GET RID OF FLEAS!!!! Contract with Orkin 6x year for 1 year.-
add towel bars and hooks to master bath (satin nickel) -
stain behind picture frame marks on wall CHANGE to let them all be for 8 months CHANGE to paint all paneling white or other light beachy color
-paint kitchen counter while waiting for permanent replacement
-paint kitchen cabinetry while waiting for replacements
- replace kitchen hardware
-
take down overhead cabinets and put up shelves with iron brackets (iron brackets added to range hood) -paint wood paneling in dining area, add trim, remove from around fire place
-add brick/slate to wall behind wood-burning stove so that it continues up the stairs to the top? oR Remove all brick and move stove down to basement?
-
remove carpet and vinyl flooring in dining room and kitchen in order to prime and paint subfloor while waiting for new hardwood Pictures to come soon. I really am in awe of the amount I've done thus far without much pressure on myself to check things off the list (obviously, since I haven't even checked the list in months and haven't been working consistently). Getting the toilet done all by myself in the Coop was a huge feat both physically and mentally. I was so worried that I wouldn't be able to do it - but it's done! And it's fantastic! Now if I can just mend that marble tile or figure something out with that.... While there have been a few additions due to the nature of DIY spawning more and more DIY projects, it's starting to seem almost manageable now. Especially with the Coop nearing sale.... Once that is gone, I can fully concentrate on where to live in the City, getting some pets and fixing up the Country house!
No comments :
Post a Comment