Saturday, August 22, 2009

Things are looking up



This is my best friend's mother's apartment, which is the mirror-image and right next door to mine. She has been living without a hallway light fixture for months now, all because we got a little too excited when renovating her kitchen (the Tiffany-blue walls you can catch a glimpse of and you can see in all it's glory right here: http://www.thekitchn.com/thekitchn/february-jumpstart-2009-entries/how-to-make-over-moms-kitchen-in-one-weekend-february-jumpstart-project-2009-077319

Well, I finally decided to take matters in my own hands this morning while the painters were finishing up at my place. I used the old light fixture from my bedroom (which now has a ceiling fan!) and jerry-rigged the chandelier together using a ceiling bracket and sheer willpower....





In other news, the painters finished.

















I have new brushed satin nickel knobs and handles for the kitchen and they look divine w/the wood and new countertops. I'm still tweaking the layout of the bathroom tile, but it's coming together.

It's amazing what a fresh coat of paint can do for the mind and the soul.... I'm ready to sell this place for a profit and move on to bigger and better things (that purr and woof).

Picture updates









Tuesday, August 18, 2009

If it's not one thing....

....it's another! Now that the holes in the walls are patched and primed - which was news to me, they never primed after patching before - they decided to slop the gray primer on my brand-new light switches/outlets :( UGH! So frustrating when I could have removed them, but since they have never bothered to paint after patching before.... just frustrating.

Then, of all things, the kitchen P-trap drain elbow split in half on me. I was simply investigating to see what the hold-up was as I'm guessing the workers dumped drywall dust and debris in the sink.... then the P-trap split - water everywhere. This is not the first water damage to sully the under-sink cabinet, but damn. Just not what I was trying to focus on as the real painters are coming tomorrow!!!!

At least with all of these headaches, I am finally looking forward to getting it done and over with.

Updates:

COOP:
1. Plumber to fix kitchen sink and bathtub CHANGE to Bathfitter October 13th
2. Electrician to fix outlet in living room
-Move kitchen cabinets to Left Side CHANGE to add base and upper cabinet in left corner October 13th b/t 3:30-6 and flip refrigerator
-Remove tile from bathroom walls CHANGE to Bathfitter October 14th
3. Plasterer (Mom) to fix walls in all rooms (unpainted walls & ceilings)
4. Sheet vinyl for bathroom and kitchen floor CHANGE to mend tile in bathroom (OCTOBER 9th, ebay) and kitchen (need propane or dry ice) CHANGE to mend hole in floor and put down a thin vinyl (bought 7/25) that won't go too far above the surface
5. Countertop for kitchen - 6 foot and 8 foot -Strip window and door in bathroom
-cut counter for sink and for stove island & install
6. Paint trim (satin) and hall(s)(linen) and Kitchen
-Faux glaze paint over patches
CHANGE TO HIRE PAINTERS TO PAINT ENTIRE APARTMENT 7/25 - hired for Aug. 19th
- Workers need to patch up the gigantic holes in my living room before I can sign the contract
-Paint Bathroom window and touch up radiator with rustoleum satin white
7. Replace toilet to 12 inch. model
8. Spray range, hood and fridge
9. Install hardware in kitchen
10. Add trim or shim up the cabinet to meet the new cabinet height
11. Install toe-kick under kitchen cabinets
12. Install ceiling fan in bedroom
13. Fix kitchen sink/drain

Saturday, August 1, 2009

Cool Breeze

On the rocks

We are halfway home, folks. I didn't have candelabra lightbulbs, so just the fan is installed. It's making a ticking noise, so I'll have to investigate further before the final reveal....

All in all? Pretty damn proud of myself.